The safety inspection of overhead crane

The safety inspection of overhead EOT crane in order to ensure the safe operation, during the operation of the need for a number of safety routine inspection, inspection items and key points are as follows:
1.The lifting height limiter, the travel limit switch and the interlock mechanism are normal, safe and reliable.
2.The main components meet the safety requirements: opening increase less than 15% of the original size, the torsional deformation is less than 10%; the 50% plate hook bushing wear is 5% smaller than the original size, the plate hook spindle wear less than 5%, no peeling, burr, welding.
3.Hook rack and pulley without obvious defects.
4.The wear and corrosion of the surface of the steel wire rope is less than 40% of the diameter of steel wire, broken wire within a twist less than 10% of the total number, no break, no thinning, no core extrusion, no blind angle twisting, no extrusion deformation, no annealing, no burning phenomenon.
5.The clips,clamp and wedge connection at the end of the wire rope connecting and fixing is intact, no loose plate, not less than 2 clamps, not less than 3 clips.
6.The drum has no crack, the connection and the fixation are not loose, and the abrasion of the cylinder wall is less than 20% of the original wall thickness; the safety volume is not less than 2 circles, and the ratio of the diameter of the drum and the steel wire meets the requirements.
7.The balance wheel is in good condition, and the wire rope should meet the requirements.
8.Brake no crack, no loose, no serious wear, brake clearance on both sides of the same size, there is sufficient braking force, brake wear is less than 50% of the original thickness.

Through the safety inspection of the overhead crane, it has played a significant role in preventing the personal accident, reducing the equipment accident, improving the running rate of equipment and reducing the maintenance cost.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for ...