跳至主要内容

Main motor dismounting method of electric hoist

The main components of the single girder EOT crane is the electric hoist. electric single girder crane has total six movement, while the electric hoist accounted for four, and the main motor to control the upper and lower movement of the electric hoist, so can be seen that the electric hoist is important in the electric single beam crane.The main overhead crane motor of the 5 tons rated lifting weight of single girder crane is 7.5KW , the improper use in the long-term use will sometimes damage the main motor, such as outdoor running without rainproof causing the motor short circuit; such as lack phase operation causing the motor burned; and such as motor wear causing rotor bearing damage and so on. In this case, we need to replace or remove the motor, how to remove the main motor of the electric cable hoist hanging on the crane?
The steps are as follows:
1.Preparation work, scaffolding or ladders, two lever hoists, other related tools;
2.After preparation, firstly cut off the power supply, and then remove the fire limit and the relevant power line, to ensure that without pulling in the process of the whereabouts of the motor;
3.The third step is to pull the pull gourd, this step is more critical, but also very easy to go wrong. The upper part of the motor generally has a lifting hook, and the handle is pulled by two hooks of the chain electric hoist. The problem is the motor has a long shaft extensed into the drum hoist, after you loosen the screws the electric motor is not easy to fall, if you can handle in the direction of main girder, can make the motor position move horizontally leaving the electric hoist and then decreased, so it is easy to take out the motor, can lower the motor with two manual hoist.

WOKAITE 0.25/0.4KW 4/6P 220V-440V 50/60Hz KDA030 Series crane duty motors specifications

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additional load

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for sale