Cause analysis of the damage of electric hoist rope

Electric drum occurs electric chain block hoist rope breaking phenomenon after the replacement of the drum for a short time, although the rope guide device is vulnerable parts, but in addition, there is an unexplained collapse.
Rope guide specifications: unless calibration, can generally be divided into for cast steel and for cast iron, the steel drum rope guide for the lifting height above 12 meters with smaller diameter, cast iron drum rope guide for lifting height below 12 meters with large diameter.
After the replacement of the drum of the electric wire rope hoist is not the original component, it may lead to the uneven force of the guide rope, and may be because of the installation procedure or the components do not match. WOKAITE recommends you, if parts damaged, must try to contact the buyer at the time of the original components. The maintenance of explosion proof hoist should be carried out in accordance with GB3836.13, the danger zone rope and roller movement is also involved in explosion-proof safety, belong to the category of non electric explosion.

WOKAITE 0.5-20ton CD1/MD1 Electric Cable Hoist

Electric wire rope hoist capacity 0.5T/1T/2T/3T/5T/10T/16T/20T,its standard number of meters of wire rope,6M/9M/12M/18M/24M/30M.It is also divided into CD1(single speed) and MD1(Double speed)

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for ...