跳至主要内容

Working principle of electric hoist motor

The DC disc brake of the electric hoist motor is mounted on the end cover of the motor shaft. When the crane duty motor is connected to the power supply, the electric hoist motor works at the same time. Because of the electromagnetic suction, attracts the armature and the compression spring, brake disc on the armature end cover is disengaged, crane duty motor running. When the power is turned off, the electromagnet electric hoist motor without magnetic force, the spring pushes the armature to the brake disc, the effect of friction torque, braking the motor stop immediately; our factory also produces the corresponding KDA050 dual speed motor. Electric hoist motor power supply by the rectifier in the motor junction box, and below 3 kilowatts to 4 kilowatts and above AC220V-DC99V, AC380V-DC170V (special time can also be in accordance with the requirements of the factory design such as (DC24V)), KDA050  series electric hoist motor, can move quickly after the realization of motor power loss. Fast braking time KDA0150 motor is less than 0.15 seconds, KDA0100 motor is less than 0.20 seconds, the crane duty motor can be based on user requirements by changing the wiring box wiring to achieve slow braking. This series motor has small noise and reliable braking performance. Its working principle is: when the motor braking power, braking motor by 220V 198V DC AC rectifier, then the electromagnetic armature is attracted, the brake disc is rotating, and electric hoist motor but free rotation. When the electric hoist motor is energized when the solenoid energized, the armature is immediately spring-loaded, the brake disc and the motor rear cover are pressed together to stop rotating.

评论

  1. Nice blog.Thank you for sharing the valuable information.Keep update with your blogs...Electric Hoists

    回复删除

  2. very informative blog..keep update with your blogs..
    Hydraulic Winch

    回复删除
  3. Thank you for sharing this good article, it was so good to read and very useful to update my skill as updated one.
    Hoist pendant station

    回复删除
  4. You made such an interesting piece to read, giving every subject enlightenment for us to gain knowledge.
    Wire Rope Hoist

    回复删除

发表评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for ...