跳至主要内容

Overhead crane operation notes

1.Each overhead crane shall be marked with a nominal weight on the obvious place.
2.In the work, don’t allow people on the overhead crane, or transport people or with a hook.
3.No operating license and drink are not allowed to drive crane.
4.The operation must be focused, not talking, smoking, or something else.
5.The trolley needs to be clean; no place equipment, tools, flammable goods, explosive and dangerous goods.
6.Overload are not allowed.
7.Don’t lift any of the following circumstances:
(a)Bundling is not strong;
(b)Mechanical overload;
(c)Unknown signal;
(d)Diagonal pulling;
(e)Objects buried or frozen in the ground;
(f)Someone on the hanging object;
(g)Flammable goods, explosive and dangerous goods without safety protection measures;
(h)Too full of liquids
(i)Wire rope does not meet the safety requirements;
(j)Lift mechanism failure.
8.Crane moving on the line with no obstacles, hook or hoist and the bottom surface of the weight, must be lift 2m up above the ground. When move through the obstacle, it must be 0.5m over than the obstacle.
9.For the lifting of less than 50% of the rated weight of the object, allowing the simultaneous action of the two mechanisms; If the lifting of more than 50% of the rated load, only one mechanism can be operated.
10.Overhead crane with main and auxiliary hook with crane scale, not to rise or fall at the same time, the main and auxiliary hook.
11.Welding or hammer is not in the suspended object, and working under the weight is not allowed.
12.Must be after the power is off, and hung the symbol of power failure operation, then do the check or maintaince. If you must live working, must have security measures, and has a special care.
13.Don’t throw anything off the trolley.
14.Limit switches and interlocks shall be checked regularly.
15.Limit switches are not allowed to be used as parking.
16.When lift brake in trouble, lifting weights are not allowed.
17.Hanging objects are not allowed to run over people or equipment.
18.The crane in the welding process, must set the ground, do not use the ground.
19.When the hook in the lowest limit position, the drum must retain a safety rope above two times.
20.Double girder eot crane is not allowed to collide with each other, but also do not allow the use of a crane to promote the work of another crane.
21.Lifting heavy objects, liquid metal, explosive and dangerous goods, must firstly slowly lifting off the ground 100~200mm, test the reliability of the brake.
22.Repair and inspection of the lighting, the voltage must be below 36V.
23.All electrical equipment shell of overhead crane should be connected to ground. If the trolley track is not welded on the main end carriage, welding ground wire should be adopted. Available cross-sectional area of ground wire is more than 75 square millimetre made by galvanized flat steel or 10 square millimetre bare copper wire or galvanized steel bar which is greater than 30 square millimetre. The grounding position of the cab or lifting body should be more than two. The grounding resistance between any point on the crane to the neutral point of the power supply shall be less than 4Ω.
24.Regular safety inspection and the preflight preparation.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additional load

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for sale