Test procedure before use for the electric chain fall hoist

Before the use of the chain fall hoist will have a simple operation test, the following WOKAITE introduce the operation steps for you in detail:
1.Press the “down” button, drive the chain fall hoist down until the limit position, the motor will automatically stop.
2.Press the “up” button, until the chain is fully retracted into the chain bag, and the motor stops running.
3.Check the lubrication of the load chain. The load chain has already lubricated before delivery, but it’s probably going to dry up in transit, any ready-made lubricating oil can be used to lubricate the lifting chain, we recommend that you keep a small amount of lubricating oil in the chain in the bag, so that the chain can be immersed in the lubricating oil.
4.When the load chain of the chain electric hoist is double chain or multi chain, it is strictly prohibited to turn down the lower hook from the chain to avoid danger.
5.Check the direction of the chain, all the welding points should be in the same direction, can operate the chain electric hoist correctly only when all the chain welding points are in the same line.

WOKAITE is a china professional manufacturer of electric chain fall hoist 0.3~100 ton, just feel free to contact us, your inquiry will be replied within 24 hours.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for ...