Five common problems in operation of CD type electric hoist

1.Can not eliminate the slip phenomenon of trolley. Some repair work that need frequent refueling to make electric trolley rolling on the I-steel track flexibly, in fact as long as put some ZG-3 calcium based grease on the wheel (once every 6 months). Too much oil on the track is easy to adsorb foreign body, leading to wheel slip, affect the normal use of electric chain block. When the trolley slips, it should be timely to remove the cover on the track, must not add oil to the track.
2.Improper handling of wire rope winding. Wire rope winding is one of the common faults of electrical chain block, when some maintenance personnel found this kind problem, try to continue to rotate the drum to loosen the wire rope, the result is to caused damage to the wire rope. The right way is to remove the rope guide first, rotate the drum to straighten out the wire rope, and then re install the rope guide.
3.Speed reducer run lack of oil. It will increase noise. When the speed reducer make abnormal noise, do not rush to disassemble, the HJ-50 mechanical oil should be injected into the hole of the upper part, and then observed running state, generally can eliminate noise. If the noise is still very large after refueling, you must remove the speed reducer, gear or replacement of bearings.
4.The “block” operational errors. In the use of electrical chain hoist, such as brake failure, weight quickly fall, should immediately press the up button, lift the weight for a distance, then press the down button, drop at normal speed, maintenance brake after discharge. Some operators confused when “block”, cause the object fall to the ground quickly.
5.Wire rope keep working despite worn out. Many companies only consider saving, ignoring safety, wire rope wear seriously still continue to use, increase the probability of break the rope, leading to accidents. Therefore, when the broken wire rope in a twist pitch more than 22 root, must replace the rope, strictly prohibited to continue to use.

WOKAITE CD1/MD1 Electric Cable Hoist

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Overhead gantry crane lifting instructions

The overhead crane in workshop should not use mechanical lifting, because the top of the rail is close to the bottom chord of roof truss, in addition, the volume and weight of the heavy duty gantry crane are large. Small and medium sized overhead travelling gantry crane used single mast upright integral hoisting, which can improve work efficiency, shorten the construction period, reduce high-altitude operations, the construction procedures are as follows. Erecting mast 1.The height of the mast The maximum height of the mast is the height from the ground to the roof, minus the operating space between the top of the mast to the roof panel and the height of the sleeper. Minimum height should meet the needs of lifting height. 2.Mast position Since the mast is to be erected at the center of gravity of the travelling gantry crane between the two main girders of the trolley, the trolley must be biased, and the mast should also deviate from the centre line of the plant. The deviatio...