Fetching device for double girder bridge crane

It is great significance for safe production and improvement of production efficiency to select the appropriate fetching device. Due to the double girder bridge crane has a wide variety loading and unloading of objects, there are pieces, scattered and liquid, and so on, their physical properties and characteristics are so different. In order to adapt to load and unload all kinds of goods, commonly used extraction device as grab, electromagnetic sucker, rings, bar, clamp, vacuum suction, hopper, bucket and bearing beam, in addition to the special container spreader and other special tools.
Hook is the most widely used device for double girder bridge crane. Grab bucket is mainly used for loading and unloading a large number of bulk materials, but also used to grab the logs. Grab bucket is a kind of automatic fetching device, and its grasping and discharging action is controlled by the driver in the driver’s cab, without the assistance of the auxiliary personnel, which greatly improves the loading and unloading efficiency. The electromagnetic chuck is suitable for lifting the magnetic metal material, and is only used for absorbing black metal below 500 DEG C.
In the case that the material is often changed and the productivity is high, can select dual-purpose double girder bridge crane, which is a grab bucket and an electromagnetic chuck, or a grab and a hook, or an electromagnetic chuck and a hook. The lifting trolley is provided with two sets of lifting mechanisms which are respectively independent. But the two devices can not work at the same time.
In the special occasions that the lifting material change frequently, but productivity requirement is not very high, can choose three-purpose double girder bridge crane, according to the need, the hook can be hung with an electric grab or an electromagnetic chuck.

WOKAITE 3-50 ton Double Girder Overhead Crane

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

Cause analysis of the damage of electric hoist rope

Electric drum occurs  electric chain block hoist  rope breaking phenomenon after the replacement of the drum for a short time, although the rope guide device is vulnerable parts, but in addition, there is an unexplained collapse. Rope guide specifications: unless calibration, can generally be divided into for cast steel and for cast iron, the steel drum rope guide for the lifting height above 12 meters with smaller diameter, cast iron drum rope guide for lifting height below 12 meters with large diameter. After the replacement of the drum of the  electric wire rope hoist  is not the original component, it may lead to the uneven force of the guide rope, and may be because of the installation procedure or the components do not match.  WOKAITE  recommends you, if parts damaged, must try to contact the buyer at the time of the original components. The maintenance of explosion proof hoist should be carried out in accordance with GB3836.13, the danger zone r...

Overhead gantry crane lifting instructions

The overhead crane in workshop should not use mechanical lifting, because the top of the rail is close to the bottom chord of roof truss, in addition, the volume and weight of the heavy duty gantry crane are large. Small and medium sized overhead travelling gantry crane used single mast upright integral hoisting, which can improve work efficiency, shorten the construction period, reduce high-altitude operations, the construction procedures are as follows. Erecting mast 1.The height of the mast The maximum height of the mast is the height from the ground to the roof, minus the operating space between the top of the mast to the roof panel and the height of the sleeper. Minimum height should meet the needs of lifting height. 2.Mast position Since the mast is to be erected at the center of gravity of the travelling gantry crane between the two main girders of the trolley, the trolley must be biased, and the mast should also deviate from the centre line of the plant. The deviatio...