跳至主要内容

The characteristics of low headroom electric hoist

Low headroom electric hoist with exquisite design structure, excellent performance, novel and beautiful appearance, in line with the latest international DIN, FEM standard, reached the technical level of similar foreign products. Suitable for machining, assembly, warehouse and other material handling sites, especially suitable for height limited workshop.
1.The optimum clearance height, can make the lifting height increased from 200 to 500mm compared with ordinary CD hoist.
2.Excellent transmission technology, lifting speed reducer uses high quality alloy steel, triple reduction, smooth operation, long service life, reliable performance, to avoid the many disadvantages of CD hoist intermediate shaft when long distance transmission.
3.Motor is a specially designed new self cooled cone type motor, motor shell cast by the aluminum alloy material for good heat dissipation performance, F class motor insulation, IP54 class protection, a level higher than the usual motors.
4.Electrical components using the world first-class Schneider products, using high capacity contactor, using quick plug to connect control switch and motor and other electric parts, making the field installation more convenient; the gourd leakage cable parts of PE bellows protection to ensure cable and the connection is reliable.
5.Can be based on user requirements: hoist running, lifting single or double speed or variable frequency stepless speed control, remote control, overload protection, motor overheating protection and other functions.
6.Delicate structure, beautiful appearance, has a lot of unique innovation:
(1)Low headroom electric hoist body without leakage cable, cable everywhere were arranged in the interior of the low headroom electric chain hoist by various means, making the shape more beautiful; such as supporting shaft is a hollow thick wall steel pipe, in ensuring the intensity of use, reduce the overall weight of the electric hoist, and by which to achieve the cables from left to right.
(2)The low headroom electric chain hoist with compact structure, the counterweight box type, users can add all kinds of scrap steel or stone, save the steel, and reduce exterior dimensions compared with counterweight block type low headroom electric hoist.
(3)Hoist operation using NF series helical gear reducer drive, on both sides of the driving wheel through a hexagonal steel torque transmission, large transmission torque, high reliability, to avoid the flat key shear failure, and this kind of transmission is also very good for installation and adjustment of hoist operation.
(4)The cover of part of low headroom electric chain hoist motor using square welding structure, surrounded by mounting bolt holes, high versatility, quick change into fixed or hanging trolley type electric low headroom electric hoist, can pull the rope from 360 degree direction.
7.The whole structure is convenient for disassembly and installation, maintenance and good maintainability.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additional load

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for sale

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed