跳至主要内容

Installation technique of 15 ton chain hoist

15 ton chain hoist is often used within a workshop to lifting tools, this kind of small volume, light weight, convenient installation, operation and lifting hoist are very stable, has begun to replace bulky type 15 ton hoist. Before buying the electric chain hoist, according to the following several points to identify the quality of electrical chain block. First of all, after turning on the power supply, control electric chain hoist to move around, observe if the direction key is correct, also pay attention to whether or not there is brake voice when stopped. And, check whether the chain is down or not after stopping, if there is, that means the sheet is too loose, or is not installed properly. If these no problem, click on the button to up and down, observe the running distance, the smaller the 15 ton hoist run, the better. In some factory or workshop, sometimes need to run relatively small distance. Such as installing or docking, need 15 ton hoist rise or fall slowly, to facilitate calibration and installation, but electrical chain block is mostly single speed, even double speed is not slow enough to meet the requirement of installation speed. In this case, it need click stop to make the running time very short, so the moving range is relatively small, and can calibrate in each time point, until the equipment installation is complete. This is reason of why in the choice of 15 ton chain hoist need to click stop to check the lifting distance, in principle, the smaller the lifting distance is, the better.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Overhead gantry crane lifting instructions

The overhead crane in workshop should not use mechanical lifting, because the top of the rail is close to the bottom chord of roof truss, in addition, the volume and weight of the heavy duty gantry crane are large. Small and medium sized overhead travelling gantry crane used single mast upright integral hoisting, which can improve work efficiency, shorten the construction period, reduce high-altitude operations, the construction procedures are as follows. Erecting mast 1.The height of the mast The maximum height of the mast is the height from the ground to the roof, minus the operating space between the top of the mast to the roof panel and the height of the sleeper. Minimum height should meet the needs of lifting height. 2.Mast position Since the mast is to be erected at the center of gravity of the travelling gantry crane between the two main girders of the trolley, the trolley must be biased, and the mast should also deviate from the centre line of the plant. The deviatio...