跳至主要内容

Note the use of wire rope block

1.The first installation or reassembly of wire rope blocks, should be carried out no-load operation, but to ensure that the components must be installed, do not power.
2.Should be carried out in the normal use of the rated load of 125%, up from the ground about 100 mm, static load test for 10 minutes, and check whether it is normal.
3.Dynamic load test is based on the rated load weight, for repeated movements and move around the test, after the test to check the mechanical transmission part, electrical part and the connection part is normal and reliable or not.
4.Do not allow to use under the absolute prohibition environment, and exceed the rated load and rated closing times (120) per hour.
5.When installation, debugging and maintenance, must be strictly check the limit device is flexible and reliable or not, when the hook up to limit high position, distance between hook shell and the drum shell must greater than 50mm (10t and 16t, while 20t must greater than 120 mm). When the hook to the limit low position, should guarantee there are safety wire rope rings on the drum circle, effective safety ring must be more than 2 circle.
6.Not allowed pressing the switch button which make two wire rope blocks move in the opposite direction at the same time.
7.After the work is completed, the power supply must be pulled apart to cut off the power supply.
8.Wire rope blocks should be operated by specialized person, operators should fully grasp the safe operating procedures, strictly prohibited inclined hanging.
9.Must check the electric hoist regularly by specialized person, take timely measures when found that failure, and carefully recorded.
10.When adjust the quantity of electric chain block brake glide, should guarantee that, brake slide S≤V/100 under the rated load (V is the stable lifting distance under load in a minute).
11.Scrap standard of wire rope: the inspection and scrap standard of the wire rope is executed according to CB/T5972-1986.
12.Wire rope blocks must maintain sufficient lubricating oil, and keep the oil clean, should not contain impurities and dirt.
13.You should use a stiff brush or wood piece to oil the wire rope, directly to the working rope oil by hand is prohibited.
14.When wire rope block does not work, it is not allowed to hang heavy objects in the air, to prevent the parts from permanent deformation.
15.If the failure is found, should immediately cut off the main power supply.
16.Should pay special attention to the situation of wearing parts.
17.10~20 tons wire rope hoist in a long time running, the automatic power outages may occur, which belongs to the motor overheating protection function, should down the wire rope block, continue to work until the motor cooled down.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additional load

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for sale