跳至主要内容

The end carriage plays an important role in the crane

The end carriage plays an important role in the EOT crane, which is the key component of the load shifting and transportation. End carriage is composed of wheel and frame, end carriage part is mainly composed of the cover,web and bottom cover plate; end carriage is formed by two segments through a connecting plate and angle steel with high strength bolt connection. A reinforcing rib is arranged in the inner of the end carriage to ensure the stability when load. Main dimensions of the end carriage is determined according to the span of the main girder, the track of the cart and trolley; the operation of the cart is driven by the separately driven scheme.When assembling the crane, firstly connect one section to one of the main carriages, and then connect the two section of the end carriage together.

评论

  1. Nice article about cranes and material handling equipment. I come across various techniques associated with cranes through this blog. Crane Manufacturers always works according to modern techniques and offers best material handling equipment.

    回复删除
  2. Pioneer Cranes & Elevators is one of the Best EOT Cranes Manufacturers. All Cranes equipment is manufactured in peace to International Standards and is of high quality and expertise. The team here is very professional and skillful in providing the customer with the best services. Excellent Quality customer service is a main part of our business that way we provide 24x7 customer service. Moreover, entire range of EOT Cranes, JIB Cranes, Overhead Crane, Single Girder EOT Crane, Wire Rope Hoists is tested on various parameters of quality in demand to deliver perfect product at clients' end.

    回复删除

发表评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

Cause analysis of the damage of electric hoist rope

Electric drum occurs  electric chain block hoist  rope breaking phenomenon after the replacement of the drum for a short time, although the rope guide device is vulnerable parts, but in addition, there is an unexplained collapse. Rope guide specifications: unless calibration, can generally be divided into for cast steel and for cast iron, the steel drum rope guide for the lifting height above 12 meters with smaller diameter, cast iron drum rope guide for lifting height below 12 meters with large diameter. After the replacement of the drum of the  electric wire rope hoist  is not the original component, it may lead to the uneven force of the guide rope, and may be because of the installation procedure or the components do not match.  WOKAITE  recommends you, if parts damaged, must try to contact the buyer at the time of the original components. The maintenance of explosion proof hoist should be carried out in accordance with GB3836.13, the danger zone r...

Overhead gantry crane lifting instructions

The overhead crane in workshop should not use mechanical lifting, because the top of the rail is close to the bottom chord of roof truss, in addition, the volume and weight of the heavy duty gantry crane are large. Small and medium sized overhead travelling gantry crane used single mast upright integral hoisting, which can improve work efficiency, shorten the construction period, reduce high-altitude operations, the construction procedures are as follows. Erecting mast 1.The height of the mast The maximum height of the mast is the height from the ground to the roof, minus the operating space between the top of the mast to the roof panel and the height of the sleeper. Minimum height should meet the needs of lifting height. 2.Mast position Since the mast is to be erected at the center of gravity of the travelling gantry crane between the two main girders of the trolley, the trolley must be biased, and the mast should also deviate from the centre line of the plant. The deviatio...