跳至主要内容

Main technical requirements of overhead crane double girder

Overhead crane double girder is the main stress components in EOT crane by about two webs, upper and lower cover plates and a number of large and small plates and stiffened plates.
Main technical requirements
Arch degree of the main overhead crane double girder: When the load is carried, the deflection can be offset by the deformation under the condition of the main girder, so as to avoid the carrying trolley climbing.
Main girder side change: In the manufacture of bridge. After the side welding with drawing residual stress, when the transport and use the release of residual stress, resulting in two main girders of the inward side bend; and the main overhead crane double girder under the horizontal inertial load, according to the stiffness conditions allow have certain lateral bending, both stack and caused by bending deformation.
Usually by stiffness and strength condition, and the cross-sectional area is smallest, which can satisfy the construction requirements (such as the maximum height of crane girder and platform welding girder limited by construction conditions), to determine the height of the girder, and then a preliminary estimate of the web of the girder, the thickness of the cover, the geometrical features of the cross section are calculated, and checking in, after proper adjustment until all qualified.

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

Cause analysis of the damage of electric hoist rope

Electric drum occurs  electric chain block hoist  rope breaking phenomenon after the replacement of the drum for a short time, although the rope guide device is vulnerable parts, but in addition, there is an unexplained collapse. Rope guide specifications: unless calibration, can generally be divided into for cast steel and for cast iron, the steel drum rope guide for the lifting height above 12 meters with smaller diameter, cast iron drum rope guide for lifting height below 12 meters with large diameter. After the replacement of the drum of the  electric wire rope hoist  is not the original component, it may lead to the uneven force of the guide rope, and may be because of the installation procedure or the components do not match.  WOKAITE  recommends you, if parts damaged, must try to contact the buyer at the time of the original components. The maintenance of explosion proof hoist should be carried out in accordance with GB3836.13, the danger zone r...

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for ...