Overhead crane double girder is the main stress components in EOT crane by about two webs, upper and lower cover plates and a number of large and small plates and stiffened plates.
Main technical requirements
Arch degree of the main overhead crane double girder: When the load is carried, the deflection can be offset by the deformation under the condition of the main girder, so as to avoid the carrying trolley climbing.
Main girder side change: In the manufacture of bridge. After the side welding with drawing residual stress, when the transport and use the release of residual stress, resulting in two main girders of the inward side bend; and the main overhead crane double girder under the horizontal inertial load, according to the stiffness conditions allow have certain lateral bending, both stack and caused by bending deformation.
Usually by stiffness and strength condition, and the cross-sectional area is smallest, which can satisfy the construction requirements (such as the maximum height of crane girder and platform welding girder limited by construction conditions), to determine the height of the girder, and then a preliminary estimate of the web of the girder, the thickness of the cover, the geometrical features of the cross section are calculated, and checking in, after proper adjustment until all qualified.
评论
发表评论