跳至主要内容

Manipulation of crane

For the double girder eot crane of high lifting weight, high work level and high operation speed, generally use of cab control mode, to ensure the safety. The cab is usually fixed on one side of the bridge. If the span of double girder overhead cranes is large, and in complex lifting situations, can select the mode of the cab moving with lifting trolley. Sometimes can also choose the mode of that the driver room can move along the main beam, the operation can be more convenient. In the situation of double girder overhead cranes running slow, short stroke, work is not busy, and asked the driver directly linking or picking the hook; in the situation of which plant is low or ground equipment is high or can not be installed the cab; in the situation of harmful gases in the upper part of the plant, that can not operate on the EOT crane, can use ground control. The operating speed of the ground handling crane is generally not more than 45 m/min. According to the need to use several ways such as ground handling is fixed on the hand switch, flashlight door moving with trolley, electric door moving freely. Because the ground control crane is connected with the cable, the operator must follow the movement of the double girder eot crane, so can also use wireless remote control, including infrared or radio remote control, make the double girder eot cranes control more flexible and convenient. This kind of control method has been widely used in foreign countries.

评论

  1. Thanks for nice information about eot cranes. Your blog focuses on every detailed aspects which boosted my knowledge regarding cranes. Santek Equipments manufactures high quality EOT Cranes.

    回复删除

发表评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additional load

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed

Working level of overhead gantry crane

Overhead gantry crane  installation site and the work conditions is vary greatly, the use of lifting capacity and working frequency are also different. In order to use the crane economically and reasonably, it is necessary to choose the appropriate working level according to the working condition of the crane. The working level of the bridge crane is divided into A1 ~ A8, according to the level of the crane and the load state, that is, according to the frequency and load degree of the crane through the calculation to determine. The crane has a certain number of working cycles during its useful life. A working cycle of a  travelling gantry crane  is to start the process of loading the goods from the beginning to the next. The total number of working cycles represent the utilization of cranes. In order to facilitate the calculation, the total number of working cycles can be divided into 10 categories. 200-400 ton heavy duty travelling  overhead gantry crane for sale