Manipulation of crane

For the double girder eot crane of high lifting weight, high work level and high operation speed, generally use of cab control mode, to ensure the safety. The cab is usually fixed on one side of the bridge. If the span of double girder overhead cranes is large, and in complex lifting situations, can select the mode of the cab moving with lifting trolley. Sometimes can also choose the mode of that the driver room can move along the main beam, the operation can be more convenient. In the situation of double girder overhead cranes running slow, short stroke, work is not busy, and asked the driver directly linking or picking the hook; in the situation of which plant is low or ground equipment is high or can not be installed the cab; in the situation of harmful gases in the upper part of the plant, that can not operate on the EOT crane, can use ground control. The operating speed of the ground handling crane is generally not more than 45 m/min. According to the need to use several ways such as ground handling is fixed on the hand switch, flashlight door moving with trolley, electric door moving freely. Because the ground control crane is connected with the cable, the operator must follow the movement of the double girder eot crane, so can also use wireless remote control, including infrared or radio remote control, make the double girder eot cranes control more flexible and convenient. This kind of control method has been widely used in foreign countries.

评论

  1. Thanks for nice information about eot cranes. Your blog focuses on every detailed aspects which boosted my knowledge regarding cranes. Santek Equipments manufactures high quality EOT Cranes.

    回复删除

发表评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

Cause analysis of the damage of electric hoist rope

Electric drum occurs  electric chain block hoist  rope breaking phenomenon after the replacement of the drum for a short time, although the rope guide device is vulnerable parts, but in addition, there is an unexplained collapse. Rope guide specifications: unless calibration, can generally be divided into for cast steel and for cast iron, the steel drum rope guide for the lifting height above 12 meters with smaller diameter, cast iron drum rope guide for lifting height below 12 meters with large diameter. After the replacement of the drum of the  electric wire rope hoist  is not the original component, it may lead to the uneven force of the guide rope, and may be because of the installation procedure or the components do not match.  WOKAITE  recommends you, if parts damaged, must try to contact the buyer at the time of the original components. The maintenance of explosion proof hoist should be carried out in accordance with GB3836.13, the danger zone r...

Overhead gantry crane lifting instructions

The overhead crane in workshop should not use mechanical lifting, because the top of the rail is close to the bottom chord of roof truss, in addition, the volume and weight of the heavy duty gantry crane are large. Small and medium sized overhead travelling gantry crane used single mast upright integral hoisting, which can improve work efficiency, shorten the construction period, reduce high-altitude operations, the construction procedures are as follows. Erecting mast 1.The height of the mast The maximum height of the mast is the height from the ground to the roof, minus the operating space between the top of the mast to the roof panel and the height of the sleeper. Minimum height should meet the needs of lifting height. 2.Mast position Since the mast is to be erected at the center of gravity of the travelling gantry crane between the two main girders of the trolley, the trolley must be biased, and the mast should also deviate from the centre line of the plant. The deviatio...