Operation regulation of electric chain hoist

1.A new installed or after dismantling electric hoist, should first be empty test run several times. But before the installation is completed, do not do electricity test.
2.Should be carried out in the normal use of the rated load of 125%, up from the ground about 100 mm, 10 minutes of static load test, and check the electric chain block is normal or not.
3.Dynamic load test is based on the rated load weight, for repeated movements and move around the test. After the test, check the mechanical transmission part, electrical part and the connection part is normal and reliable.
4.Not allowed to use under the environment of absolute prohibition, or exceed the rated load and rated closing times per hour (120).
5.During installation and maintenance, must strictly check the limit device is flexible and reliable, when a hook rises to an upper limit position, the distance between the hook shell to the drum shell must be greater than 50mm (10t, 16t, 20t must be greater than 120mm). When the hook to the lowest limit position, should guarantee the steel wire rope safety ring on the drum circle must be more than 2 times.
6.Not allowed pressing the switch button which in the opposite direction of the movement of the two electric hoist.
7.After the work is completed, the power supply must be pulled apart to cut off the power supply.
8.Electric hoist should be operated by professional operators who should fully grasp the safe operating procedures, slanting hanging is strictly prohibited.
9.Must be carried out by the specialized personnel on a regular basis to check the chain electric hoist, take measures in a timely manner when find failure, and carefully recorded.
10.When adjusting the glide quantity of electric hoist, should ensure that under the rated load, brake glide quantity S = V/100 (V is the stabilize rising distance in the load).

评论

此博客中的热门博文

How to deal with 3 ton electric chain hoist motor overheating

Any machine has the cycle and time of operation, is not suitable for a long time continuous operation. Long time operation will cause mechanical damage and even accidents, but in general if the 3 ton electric chain hoist surface temperature is too high, we need to check what is the reason. Firstly to check whether it is because the electric hoist weight is too large, beyond the 3 ton electric chain hoist rated weight. Overweight operation will make the motor over heating, overload for a long time will cause irreparable damage to the electric chain hoists for sale.  Electric hoist motor  is not overloaded, but still heating, should check whether the motor bearing damaged; Should also check whether the motor Work according to regulations, which is one of the reasons causing the motor heating. When the electric hoist motor is running, brake clearance is too small, not completely disengaged, causing great friction, while the frictional heating is also equivalent to the additi...

The reason of electrical wire rope hoist does not work after starting

Mainly because of the hoist does not reach to the rated operating voltage, there are generally 3 kinds of situations: 1.Find out whether the power supply system supply power to wire rope electric hoist , generally used test pencil, such as no power supply; 2.The main control circuit of the wire rope electric hoist is damaged, the line is broken or the contact is bad, can also let the hoist motor not be electrified. This situation, need to overhaul the main control circuit. When maintenance, in order to prevent missing phase to burn the motor casused by the main control circuit supply power to three-phase motor, or hoist motor suddenly operate and cause danger, must disconnect electrical wire rope hoist motor from the power supply, only supply power to the main control circuit. Then start and stop switch, check and analyze the working condition of the electric appliance and the line, repair or replace the failed electric appliance or line. When the main control circuit is confirmed...

Overhead gantry crane lifting instructions

The overhead crane in workshop should not use mechanical lifting, because the top of the rail is close to the bottom chord of roof truss, in addition, the volume and weight of the heavy duty gantry crane are large. Small and medium sized overhead travelling gantry crane used single mast upright integral hoisting, which can improve work efficiency, shorten the construction period, reduce high-altitude operations, the construction procedures are as follows. Erecting mast 1.The height of the mast The maximum height of the mast is the height from the ground to the roof, minus the operating space between the top of the mast to the roof panel and the height of the sleeper. Minimum height should meet the needs of lifting height. 2.Mast position Since the mast is to be erected at the center of gravity of the travelling gantry crane between the two main girders of the trolley, the trolley must be biased, and the mast should also deviate from the centre line of the plant. The deviatio...